First-principles risk assessment built into your design, with a living risk register that moves with the project.

Safety in Design is an integral part of any new development and a statutory obligation within the State WHS Acts. There are significant cost savings when health and safety are integrated at early stages of design rather than as fix-ups during or after construction.

Salus Risk uses a first principle risk assessment approach for implementing safety in design. This includes identification of hazards and recommending risk controls to eliminate or minimise the risks. Suggestions are provided for design options, including the identification of areas in which alternative solutions could be adopted, to achieve greater project efficiencies.

Why early matters

Design it out. Don’t fix it up.

There are significant cost savings when health and safety are integrated at early stages of design rather than as fix-ups during or after construction.Salus Risk Consulting

Salus works with architects, engineers and builders from concept onwards, so hazards are removed on paper, where it costs least.

Why safety belongs in design Across a project's life, the ability to design out hazards is highest at concept and design, while the cost of changing the building rises steeply through construction and operation. Safety in Design HighLow ConceptDesignDocumentationConstructionOperation Ability to design out hazards Cost of change

How risks get controlled

Aim for the top of the hierarchy

WHS law asks for risks to be eliminated so far as is reasonably practicable, and minimised where they can’t be. The most effective controls are the ones built into a facility before anyone works in it.

Safety in Design workshops focus on the upper levels of the hierarchy: eliminating hazards, substituting safer options and engineering out exposure while the design can still change.

Most effective

  1. EliminateRemove the hazard completely. Usually only possible at design stage.Level 1
  2. SubstituteReplace the hazard with something safer.Level 2
  3. IsolateSeparate people from the hazard.Level 2
  4. EngineeringPhysical controls such as ventilation, guarding or interlocks.Level 2
  5. AdministrativeProcedures, signage, training and work practices.Level 3
  6. PPEPersonal protective equipment as the last line of defence.Level 3

Least effective

The hierarchy of control measures, from Safe Work Australia’s model Code of Practice: How to manage work health and safety risks.

Related projects

Safety in Design Workshops in practice

See all Safety in Design projects
State Library of Victoria, Melbourne, VicVIC
Civic / CulturalFrom 2016

State Library of Victoria

Melbourne, Vic

Safety in Design

Redevelopment of heritage rooms and opening of the Russell St entrance.

Geelong Library & Heritage Centre, Geelong, VicVIC
Civic / Cultural2012–2015

Geelong Library & Heritage Centre

Geelong, Vic

Safety in Design

A new, six storey building to house the general library collection, heritage collection display, family discovery centre, community lounge, multimedia area, study areas, youth lounge, offices, repository, café and public amenities.

Defence Air Traffic Control Infrastructure Project, 14 RAAF BasesNational
DefenceFrom 2015

Defence Air Traffic Control Infrastructure Project

14 RAAF Bases

Safety in Design

New and refurbished air traffic control towers and associated systems and energy buildings.

Prahran Secondary College, Prahran, VicVIC
Education: Primary & SecondaryFrom 2016

Prahran Secondary College

Prahran, Vic

Safety in Design

A new vertical secondary school for 500 students.

Calvary Private Hospital, Angas & Pulteney Streets, Adelaide, SASA
Healthcare2016

Calvary Private Hospital

Angas & Pulteney Streets, Adelaide, SA

Safety in Design

Development of the largest private hospital in South Australia.

Sullivan Nicolaides Pathology Laboratory, Bowen Hills, QldQLD
Laboratories / Medical / Research2013–2016

Sullivan Nicolaides Pathology Laboratory

Bowen Hills, Qld

Safety in Design, Dangerous Goods & Laboratory Code Review

Liquid argon, packaged flammable liquids, cylinder gases storage, PC2 laboratories, pathology laboratories, offices and workshops.

Talk to a director

Planning a build, a lab or a dangerous goods store?

Every enquiry goes straight to one of our directors. Tell us about the project and we’ll tell you how we can help.